Internet-Draft state-sync March 2024
Litkowski, et al. Expires 18 September 2024 [Page]
Workgroup:
PCE Working Group
Internet-Draft:
draft-ietf-pce-state-sync-07
Published:
Intended Status:
Standards Track
Expires:
Authors:
S. Litkowski
Cisco
S. Sivabalan
Ciena Corporation
C. Li
Huawei Technologies
H. Zheng
Huawei Technologies

Inter Stateful Path Computation Element (PCE) Communication Procedures.

Abstract

The Path Computation Element (PCE) Communication Protocol (PCEP) provides mechanisms for PCEs to perform path computation in response to a Path Computation Client (PCC) request. The Stateful PCE extensions allow stateful control of Multi-Protocol Label Switching (MPLS) Traffic Engineering (TE) Label Switched Paths (LSPs) using PCEP.

A Path Computation Client (PCC) can synchronize an LSP state information to a Stateful Path Computation Element (PCE). A PCC can have multiple PCEP sessions towards multiple PCEs. There are some use cases, where an inter-PCE stateful communication can bring additional resiliency in the design, for instance when some PCC-PCE session fails.

This document describes the procedures to allow a stateful communication between PCEs for various use-cases and also the procedures to prevent computations loops.

Status of This Memo

This Internet-Draft is submitted in full conformance with the provisions of BCP 78 and BCP 79.

Internet-Drafts are working documents of the Internet Engineering Task Force (IETF). Note that other groups may also distribute working documents as Internet-Drafts. The list of current Internet-Drafts is at https://datatracker.ietf.org/drafts/current/.

Internet-Drafts are draft documents valid for a maximum of six months and may be updated, replaced, or obsoleted by other documents at any time. It is inappropriate to use Internet-Drafts as reference material or to cite them other than as "work in progress."

This Internet-Draft will expire on 18 September 2024.

Table of Contents

1. Introduction and Problem Statement

The Path Computation Element communication Protocol (PCEP) [RFC5440] provides mechanisms for Path Computation Elements (PCEs) to perform path computations in response to Path Computation Clients' (PCCs) requests.

A stateful PCE [RFC8231] is capable of considering, for the purposes of path computation, not only the network state in terms of links and nodes (referred to as the Traffic Engineering Database or TED) but also the status of active services (previously computed paths, and currently reserved resources, stored in the Label Switched Paths Database (LSP-DB).

[RFC8051] describes general considerations for a stateful PCE deployment and examines its applicability and benefits, as well as its challenges and limitations through a number of use cases.

A PCC can synchronize an LSP state information to a Stateful PCE. The stateful PCE extension allows a redundancy scenario where a PCC can have redundant PCEP sessions towards multiple PCEs. In such a case, a PCC gives control of a LSP to only a single PCE, and only one PCE is responsible for path computation for this delegated LSP.

There are some use cases, where an inter-PCE stateful communication can bring additional resiliency in the design, for instance when some PCC-PCE session fails. The inter-PCE stateful communication may also provide a faster update of the LSP states when such an event occurs. Finally, when, in a redundant PCE scenario, there is a need to compute a set of paths that are part of a group (so there is a dependency between the paths), there may be some cases where the computation of all paths in the group is not handled by the same PCE: this situation is called a split-brain. This split-brain scenario may lead to computation loops between PCEs or suboptimal path computation.

In the scope of this document, the term 'computation loop' is used to describe a behaviour of PCEP message exchange looping between PCC and PCE or between PCEs, resulting in frequent path calculations, path reporting and path updates to the network resulting in constant load on the PCE and oscillation of data plane traffic after each subsequent path update.

This document describes the procedures to allow a stateful communication between PCEs for various use-cases and also the procedures to prevent computations loops.

Further, the examples in this section are for illustrative purpose to showcase the need for inter-PCE stateful PCEP sessions.

1.1. Requirements Language

The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT", "SHOULD", "SHOULD NOT", "RECOMMENDED", "NOT RECOMMENDED", "MAY", and "OPTIONAL" in this document are to be interpreted as described in BCP 14 [RFC2119] [RFC8174] when, and only when, they appear in all capitals, as shown here.

1.2. Reporting LSP Changes

When using a stateful PCE ([RFC8231]), a PCC can synchronize an LSP state information to the stateful PCE. If the PCC grants the control of the LSP to the PCE (called delegation [RFC8231]), the PCE can update the LSP parameters at any time.

In a multi PCE deployment (redundancy, loadbalancing...), with the current specification defined in [RFC8231], when a PCE makes an update, it is the PCC that is in charge of reporting the LSP status to all PCEs with LSP parameter change which brings additional hops and delays in notifying the overall network of the LSP parameter change.

This delay may affect the reaction time of the other PCEs if they need to take action after being notified of the LSP parameter change.

Apart from the synchronization from the PCC, it is also useful if there is a synchronization mechanism between the stateful PCEs. As stateful PCE make changes to its delegated LSPs, these changes (pending LSPs and the sticky resources [RFC7399]) can be synchronized immediately to the other PCEs.


          +----------+
          |   PCC1   |  LSP1
          +----------+
             /    \
            /      \
   +---------+    +---------+
   |  PCE1   |    |  PCE2   |
   +---------+    +---------+
           \       /
            \     /
          +----------+
          |   PCC2   |  LSP2
          +----------+

In the figure above, we consider a load-balanced PCE architecture, so PCE1 is responsible to compute paths for PCC1 and PCE2 is responsible to compute paths for PCC2. When PCE1 triggers an LSP update for LSP1, it sends a PCUpd message to PCC1 containing the new parameters for LSP1. PCC1 will take the parameters into account and will send a PCRpt message to PCE1 and PCE2 reflecting the changes. PCE2 will so be notified of the change only after receiving the PCRpt message from PCC1.

Let's consider that the LSP1 parameters changed in such a way that LSP1 will take over resources from LSP2 with a higher priority. After receiving the report from PCC1, PCE2 will therefore try to find a new path for LSP2. If we consider that there is a round trip delay of about 150 milliseconds (ms) between the PCEs and PCC1 and a round trip delay of 10 ms between the two PCEs if will take more than 150 ms for PCE2 to be notified of the change.

Adding a PCEP session between PCE1 and PCE2 may allow to reduce the synchronization time, so PCE2 can react more quickly by taking the pending LSPs and attached resources into account during path computation and re-optimization.

1.3. Split-Brain

In a resiliency case, a PCC has redundant PCEP sessions towards multiple PCEs. In such a case, a PCC gives control on an LSP to a single PCE only, and only this PCE is responsible for the path computation for the delegated LSP: the PCC achieves this by setting the D flag only towards the active PCE [RFC8231] selected for delegation. The election of the active PCE to delegate an LSP is controlled by each PCC. The PCC usually elects the active PCE by a local configured policy (by setting a priority). Upon PCEP session failure, or active PCE failure, PCC may decide to elect a new active PCE by sending new PCRpt message with D flag set to this new active PCE. When the failed PCE or PCEP session comes back online, it will be up to the implementation to do preemption. Doing preemption may lead to some disruption on the existing path if path results from both PCEs are not exactly the same. By considering a network with multiple PCCs and implementing multiple stateful PCEs for redundancy purpose, there is no guarantee that at any time all the PCCs delegate their LSPs to the same PCE.


          +----------+
          |   PCC1   |  LSP1
          +----------+
             /    \
            /      \
   +---------+    +---------+
   |  PCE1   |    |  PCE2   |
   +---------+    +---------+
           \       /
   *fail*   \     /
          +----------+
          |   PCC2   |  LSP2
          +----------+

In the example above, we consider that by configuration, both PCCs will firstly delegate their LSPs to PCE1. So, PCE1 is responsible for computing a path for both LSP1 and LSP2. If the PCEP session between PCC2 and PCE1 fails, PCC2 will delegate LSP2 to PCE2. So PCE1 becomes responsible only for LSP1 path computation while PCE2 is responsible for the path computation of LSP2. When the PCC2-PCE1 session is back online, PCC2 will keep using PCE2 as active PCE (consider no preemption in this example). So the result is a permanent situation where each PCE is responsible for a subset of path computation.

This situation is called a split-brain scenario, as there are multiple computation brains running at the same time while a central computation unit was required in some deployments/use cases.

Further, there are use cases where a particular LSP path computation is linked to another LSP path computation: the most common use case is path disjointness (see [RFC8800]) and Bidirectional LSPs (see [RFC9059]). The set of LSPs that are dependent to each other may start from a different head-end.

      _________________________________________
     /                                         \
    /        +------+            +------+       \
   |         | PCE1 |            | PCE2 |        |
   |         +------+            +------+        |
   |                                             |
   | +------+                          +------+  |
   | | PCC1 | ---------------------->  | PCC2 |  |
   | +------+                          +------+  |
   |                                             |
   |                                             |
   | +------+                          +------+  |
   | | PCC3 | ---------------------->  | PCC4 |  |
   | +------+                          +------+  |
   |                                             |
    \                                           /
     \_________________________________________/


      _________________________________________
     /                                         \
    /        +------+            +------+       \
   |         | PCE1 |            | PCE2 |        |
   |         +------+            +------+        |
   |                                             |
   | +------+           10             +------+  |
   | | PCC1 | ----- R1 ---- R2 ------- | PCC2 |  |
   | +------+       |        |         +------+  |
   |                |        |                   |
   |                |        |                   |
   | +------+       |        |         +------+  |
   | | PCC3 | ----- R3 ---- R4 ------- | PCC4 |  |
   | +------+                          +------+  |
   |                                             |
    \                                           /
     \_________________________________________/


In the figure above, the requirement is to create two link-disjoint LSPs: PCC1->PCC2 and PCC3->PCC4. In the topology, all links cost metric is set to 1 except for the link 'R1-R2' which has a metric of 10. The PCEs are responsible for the path computation and PCE1 is the active primary PCE for all PCCs in the nominal case.

The rest of this section lists various scenarios for illustrative purposes, there are many other cases where the solution defined in this document is applicable.

Scenario 1:

In the normal case (PCE1 as active primary PCE), consider that PCC1->PCC2 LSP is configured first with the link disjointness constraint, PCE1 sends a PCUpd message to PCC1 with the ERO: R1->R3->R4->R2->PCC2 (shortest path). PCC1 signals and installs the path. When PCC3->PCC4 is configured, the PCEs already knows the path of PCC1->PCC2 and can compute a link-disjoint path: the solution requires to move PCC1->PCC2 onto a new path to let room for the new LSP. PCE1 sends a PCUpd message to PCC1 with the new ERO: R1->R2->PCC2 and a PCUpd to PCC3 with the following ERO: R3->R4->PCC4. In the normal case, there is no issue for PCE1 to compute a link-disjoint path.

Scenario 2:

Consider that PCC1 lost its PCEP session with PCE1 (all other PCEP sessions are UP). PCC1 delegates its LSP to PCE2.


          +----------+
          |   PCC1   |  LSP: PCC1->PCC2
          +----------+
                  \
                   \ D=1
   +---------+    +---------+
   |  PCE1   |    |  PCE2   |
   +---------+    +---------+
       D=1 \       / D=0
            \     /
          +----------+
          |   PCC3   |  LSP: PCC3->PCC4
          +----------+

Consider that the PCC1->PCC2 LSP is configured first with the link disjointness constraint, PCE2 (which is the new active primary PCE for PCC1) sends a PCUpd message to PCC1 with the ERO: R1->R3->R4->R2->PCC2 (shortest path). When PCC3->PCC4 is configured, PCE1 is not aware of LSPs from PCC1 any more, so it cannot compute a disjoint path for PCC3->PCC4 and will send a PCUpd message to PCC3 with the shortest path ERO: R3->R4->PCC4. When PCC3->PCC4 LSP will be reported to PCE2 by PCC3, PCE2 will ensure disjointness computation and will correctly move PCC1->PCC2 (as it owns delegation for this LSP) on the following path: R1->R2->PCC2. With this sequence of event and these PCEP sessions, disjointness is ensured.

Scenario 3:


          +----------+
          |   PCC1   |  LSP: PCC1->PCC2
          +----------+
            /     \
       D=1 /       \ D=0
   +---------+    +---------+
   |  PCE1   |    |  PCE2   |
   +---------+    +---------+
                   / D=1
                  /
          +----------+
          |   PCC3   |  LSP: PCC3->PCC4
          +----------+

Consider the above PCEP sessions and the PCC1->PCC2 LSP is configured first with the link disjointness constraint, PCE1 computes the shortest path as it is the only LSP in the disjoint association group that it is aware of: R1->R3->R4->R2->PCC2 (shortest path). When PCC3->PCC4 is configured, PCE2 must compute a disjoint path for this LSP. The only solution found is to move PCC1->PCC2 LSP on another path, but PCE2 cannot do it as it does not have delegation for this LSP. In this set-up, PCEs are not able to find a disjoint path.

Scenario 4:


          +----------+
          |   PCC1   |  LSP: PCC1->PCC2
          +----------+
            /     \
       D=1 /       \ D=0
   +---------+    +---------+
   |  PCE1   |    |  PCE2   |
   +---------+    +---------+
        D=0 \      / D=1
             \    /
          +----------+
          |   PCC3   |  LSP: PCC3->PCC4
          +----------+

Consider the above PCEP sessions and that PCEs are configured to fall-back to the shortest path if disjointness cannot be found as described in [RFC8800]. The PCC1->PCC2 LSP is configured first, PCE1 computes the shortest path as it is the only LSP in the disjoint association group that it is aware of: R1->R3->R4->R2->PCC2 (shortest path). When PCC3->PCC4 is configured, PCE2 must compute a disjoint path for this LSP. The only solution found is to move PCC1->PCC2 LSP on another path, but PCE2 cannot do it as it does not have delegation for this LSP. PCE2 then provides the shortest path for PCC3->PCC4: R3->R4->PCC4. When PCC3 receives the ERO, it reports it back to both PCEs. When PCE1 becomes aware of the PCC3->PCC4 path, it recomputes the constrained shortest path first (CSPF) algorithm and provides a new path for PCC1->PCC2: R1->R2->PCC2. The new path is reported back to all PCEs by PCC1. PCE2 recomputes also CSPF to take into account the new reported path. The new computation does not lead to any path update.

Scenario 5:

      _____________________________________
     /                                     \
    /        +------+        +------+       \
   |         | PCE1 |        | PCE2 |        |
   |         +------+        +------+        |
   |                                         |
   | +------+         100          +------+  |
   | |      | -------------------- |      |  |
   | | PCC1 | ----- R1 ----------- | PCC2 |  |
   | +------+       |              +------+  |
   |    |           |                  |     |
   |  6 |           | 2                | 2   |
   |    |           |                  |     |
   | +------+       |              +------+  |
   | | PCC3 | ----- R3 ----------- | PCC4 |  |
   | +------+               10     +------+  |
   |                                         |
    \                                       /
     \_____________________________________/


Now, consider a new network topology with the same PCEP sessions as the previous example. Suppose that both LSPs are configured almost at the same time. PCE1 will compute a path for PCC1->PCC2 while PCE2 will compute a path for PCC3->PCC4. As each PCE is not aware of the path of the second LSP in the association group (not reported yet), each PCE is computing the shortest path for the LSP. PCE1 computes ERO: R1->PCC2 for PCC1->PCC2 and PCE2 computes ERO: R3->R1->PCC2->PCC4 for PCC3->PCC4. When these shortest paths will be reported to each PCE. Each PCE will recompute disjointness. PCE1 will provide a new path for PCC1->PCC2 with ERO: PCC1->PCC2. PCE2 will provide also a new path for PCC3->PCC4 with ERO: R3->PCC4. When those new paths will be reported to both PCEs, this will trigger CSPF again. PCE1 will provide a new more optimal path for PCC1->PCC2 with ERO: R1->PCC2 and PCE2 will also provide a more optimal path for PCC3->PCC4 with ERO: R3->R1->PCC2->PCC4. So we come back to the initial state. When those paths will be reported to both PCEs, this will trigger CSPF again. An infinite loop of CSPF computation is then happening with a permanent flap of paths because of the split-brain situation.

Another common example to note would be two LSPs with link-diverse paths that share a common node in its path but delegated to different PCEs. In case of the common node failure, both PCEs would detect the same and each could independently compute a new path that might both choose the same new link.

This permanent computation loop comes from the inconsistency between the state of the LSPs as seen by each PCE due to the split-brain: each PCE is trying to modify at the same time its delegated path based on the last received path information which de facto invalidates this received path information.

Scenario 6: multi-domain

         Domain/Area 1        Domain/Area 2
      ________________      ________________
     /                \    /                \
    /        +------+ |   |  +------+        \
   |         | PCE1 | |   |  | PCE3 |        |
   |         +------+ |   |  +------+        |
   |                  |   |                  |
   |         +------+ |   |  +------+        |
   |         | PCE2 | |   |  | PCE4 |        |
   |         +------+ |   |  +------+        |
   |                  |   |                  |
   | +------+         |   |        +------+  |
   | | PCC1 |         |   |        | PCC2 |  |
   | +------+         |   |        +------+  |
   |                  |   |                  |
   |                  |   |                  |
   | +------+         |   |        +------+  |
   | | PCC3 |         |   |        | PCC4 |  |
   | +------+         |   |        +------+  |
    \                 |   |                  |
     \_______________/     \________________/


In the example above, suppose that the disjoint LSPs from PCC1 to PCC2 and from PCC4 to PCC3 are created. All the PCEs have the knowledge of both domain topologies (e.g. using BGP-LS [RFC9552]). For operation/management reasons, each domain uses its own group of redundant PCEs. PCE1/PCE2 in domain 1 have PCEP sessions with PCC1 and PCC3 while PCE3/PCE4 in domain 2 have PCEP sessions with PCC2 and PCC4. As PCE1/2 does not know about LSPs from PCC2/4 and PCE3/4 do not know about LSPs from PCC1/3, there is no possibility to compute the disjointness constraint. This scenario can also be seen as a split-brain scenario. This multi-domain architecture (with multiple groups of PCEs) can also be used in a single domain, where an operator wants to limit the failure domain by creating multiple groups of PCEs maintaining a subset of PCCs. As for the multi-domain example, there will be no possibility to compute the disjoint path starting from head-ends managed by different PCE groups.

In this document, we specify a solution that addresses the possibility to compute LSP association based constraints (like disjointness) in split-brain scenarios while preventing computation loops.

1.4. Applicability to H-PCE

[RFC8751] describes general considerations and use cases for the deployment of Stateful PCE(s) using the Hierarchical PCE [RFC6805] architecture. In this architecture, there is a clear need to communicate between a child stateful PCE and a parent stateful PCE. The procedures and extensions as described in Section 3 are equally applicable to the H-PCE scenario.

2. Solution

The solution specified in this document is based on:

The solution builds upon the protocol extensions for stateful PCE in [RFC8231], synchronization optimizations in [RFC8232], and PCE-initiation in [RFC8281].

2.1. State-sync Session

This document specify a mechanism to set-up a PCEP session between the stateful PCEs. Creating such a session is already authorized by multiple scenarios like the one described in [RFC4655] (multiple PCEs that are handling part of the path computation) and [RFC6805] (hierarchical PCE) but was only focused on the stateless PCEP sessions. As stateful PCE brings additional features (LSP state synchronization, path update, delegation, ...), thus some new behaviors need to be defined.

This inter-PCE PCEP session will allow the exchange of LSP states between PCEs that would help some scenarios where PCEP sessions are lost between PCC and PCE. This inter-PCE PCEP session is henceforth called a state-sync session.

For example, in the scenario below, there is no possibility to compute disjointness as there is no PCE that is aware of both LSPs.


          +----------+
          |   PCC1   |  LSP: PCC1->PCC2
          +----------+
            /
       D=1 /
   +---------+       +---------+
   |  PCE1   |       |  PCE2   |
   +---------+       +---------+
                     / D=1
                    /
          +----------+
          |   PCC3   |  LSP: PCC3->PCC4
          +----------+

If we add a state-sync session, PCE1 will be able to do state synchronization via PCRpt messages for its LSP to PCE2 and PCE2 will do the same. All the PCEs will be aware of all LSPs even if a PCC->PCE session is down. PCEs will then be able to compute disjoint paths.


          +----------+
          |   PCC1   |  LSP : PCC1->PCC2
          +----------+
            /
       D=1 /
   +---------+ PCEP  +---------+
   |  PCE1   | ----- |  PCE2   |
   +---------+       +---------+
                     / D=1
                    /
          +----------+
          |   PCC3   |  LSP : PCC3->PCC4
          +----------+

The procedures associated with this state-sync session are defined in Section 3.

By just adding this state-sync session, it does not ensure that a path with LSP association based constraints can always be computed and does not prevent the computation loop, but it increases resiliency and ensures that PCEs will have the state information for all LSPs. Also, this session will allow for a PCE to update the other PCEs providing a faster synchronization mechanism than relying on PCCs only.

2.2. Primary/Secondary Relationship between PCE

As seen in Section 1, performing a path computation in a split-brain scenario (multiple PCEs responsible for computation) may provide a non-optimal LSP placement, no path, or computation loops. To provide the best efficiency, an LSP association constraint-based computation requires that a single PCE performs the path computation for all LSPs in the association group. Note that, it could be all LSPs belonging to a particular association group, or all LSPs from a particular PCC, or all LSPs in the network that need to be delegated to a single PCE based on the deployment scenarios.

This document specify a mechanism to add a priority mechanism between PCEs to elect a single computing 'primary' PCE. Using this priority mechanism, PCEs can agree on the PCE that will be responsible for the computation for a particular association group, or set of LSPs. The priority could be set per association, per PCC, or for all LSPs. The rest of the text considers the association group as an example.

When a single PCE is performing the computation for a particular association group, no computation loop can happen and an optimal placement will be provided. The other PCEs will only act as state collectors and forwarders.

In the scenario described in Section 2.1, PCE1 and PCE2 will decide that PCE1 will be responsible for the path computation of both LSPs. If we first configure PCC1->PCC2, PCE1 computes the shortest path at it is the only LSP in the disjoint-group that it is aware of: R1->R3->R4->R2->PCC2 (shortest path). When PCC3->PCC4 is configured, PCE2 will not perform computation even if it has delegation but forwards the delegation via PCRpt message to PCE1 through the state-sync session. PCE1 will then perform disjointness computation and will move PCC1->PCC2 onto R1->R2->PCC2 and provides an ERO to PCE2 for PCC3->PCC4: R3->R4->PCC4. The PCE2 will further update the PCC3 with the new path.

3. Procedures and Protocol Extensions

3.1. Opening a state-sync session

3.1.1. Capability Advertisement

A PCE indicates its support of state-sync procedures during the PCEP Initialization phase [RFC5440]. The OPEN object in the Open message MUST contains the "Stateful PCE Capability" TLV defined in [RFC8231]. A new P (INTER-PCE-CAPABILITY) flag is introduced to indicate the support of state-sync.

This document adds a new bit in the Flags field with :

  • P (INTER-PCE-CAPABILITY - 1 bit - TBD4): If set to 1 by a PCEP Speaker, the PCEP speaker indicates that the session MUST follow the state-sync procedures as described in this document. The P bit MUST be set by both speakers: if a PCEP Speaker receives a STATEFUL-PCE-CAPABILITY TLV with P=0 while it advertised P=1 or if both set P flag to 0, the session SHOULD be set-up but the state-sync procedures MUST NOT be applied on this session.

The U flag [RFC8231] MUST be set when sending the STATEFUL-PCE-CAPABILITY TLV with the P flag set. In case the U flag is not set along with the P flag, the state sync capability is not enabled and it is considered as if the P flag is not set. The S flag MAY be set if optimized synchronization is required as per [RFC8232].

3.2. State Synchronization

When the state sync capability has been negotiated between stateful PCEs, each PCEP speaker will behave as a PCE and as a PCC at the same time regarding the state synchronization as defined in [RFC8231]. This means that each PCEP Speaker:

  • MUST send a PCRpt message towards its neighbor with S flag set for each LSP in its LSP database learned from a PCC. (PCC role)
  • MUST send the End Of Synchronization Marker towards its neighbor when all LSPs have been reported. (PCC role)
  • MUST wait for the LSP synchronization from its neighbor to end (receiving an End Of Synchronization Marker). (PCE role)

The process of synchronization runs in parallel on each PCE (with no defined order).

The optimized state synchronization procedures MAY be used, as defined in [RFC8232].

When a PCEP Speaker sends a PCRpt on a state-sync session, it MUST add the SPEAKER-ENTITY-ID TLV (defined in [RFC8232]) in the LSP Object, the value used will refer to the 'owner' PCC of the LSP. If a PCEP Speaker receives a PCRpt on a state-sync session without this TLV, it MUST discard the PCRpt message and it MUST reply with a PCErr message using error-type=6 (Mandatory Object missing) and error-value=TBD1 (SPEAKER-ENTITY-ID TLV missing).

3.3. Incremental Updates and Report Forwarding Rules

During the life of an LSP, its state may change (path, constraints, operational state...) and a PCC will advertise a new PCRpt to the PCE for each such change.

When propagating LSP state changes from a PCE to other PCEs, it is mandatory to ensure that a PCE always uses the freshest state coming from the PCC.

When a PCE receives a new PCRpt from a PCC with the LSP-DB-VERSION, the PCE MUST forward the PCRpt to all its state-sync sessions and MUST add the appropriate SPEAKER-ENTITY-ID TLV in the PCRpt. In addition, it MUST add a new ORIGINAL-LSP-DB-VERSION TLV (described below). The ORIGINAL-LSP-DB-VERSION contains the LSP-DB-VERSION coming from the PCC.

When a PCE receives a new PCRpt from a PCC without the LSP-DB-VERSION, it SHOULD NOT forward the PCRpt on any state-sync sessions and log such an event on the first occurrence.

When a PCE receives a new PCRpt from a PCC with the R flag (Remove) set and an LSP-DB-VERSION TLV, the PCE MUST forward the PCRpt to all its state-sync sessions keeping the R flag set (Remove) and MUST add the appropriate SPEAKER-ENTITY-ID TLV and ORIGINAL-LSP-DB-VERSION TLV in the PCRpt message.

When a PCE receives a PCRpt from a state-sync session, it MUST NOT forward the PCRpt to other state-sync sessions. This helps to prevent message loops between PCEs. As a consequence, a full mesh of PCEP sessions between PCEs are REQUIRED.

When a PCRpt is forwarded, all the original objects and values are kept. As an example, the PLSP-ID used in the forwarded PCRpt will be the same as the original one used by the PCC. Thus an implementation supporting this document MUST consider SPEAKER-ENTITY-ID TLV and PLSP-ID together to uniquely identify an LSP on the state-sync session.

The ORIGINAL-LSP-DB-VERSION TLV is encoded as follows and MUST always contain the LSP-DB-VERSION received from the owner PCC of the LSP:

 0                   1                   2                   3
 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|           Type=TBD2           |            Length=8           |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|                 LSP State DB Version Number                   |
|                                                               |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+

Using the ORIGINAL-LSP-DB-VERSION TLV allows a PCE to keep using optimized synchronization ([RFC8232]) with another PCE. In such a case, the PCE will send a PCRpt to another PCE with both ORIGINAL-LSP-DB-VERSION TLV and LSP-DB-VERSION TLV. The ORIGINAL-LSP-DB-VERSION TLV will contain the version number as allocated by the PCC while the LSP-DB-VERSION will contain the version number allocated by the local PCE.

3.4. Maintaining LSP States from Different Sources

When a PCE receives a PCRpt on a state-sync session, it stores the LSP information into the original PCC address context (as the LSP belongs to the PCC). A PCE SHOULD maintain a single state for a particular LSP and SHOULD maintain the list of sources it learned a particular state from.

A PCEP speaker may receive state information for a particular LSP from different sources: the PCC that owns the LSP (through a regular PCEP session) and some PCEs (through PCEP state-sync sessions). A PCEP speaker MUST always keep the freshest state in its LSP database, overriding the previously received information.

A PCE, receiving a PCRpt from a PCC, updates the state of the LSP in its LSP-DB with the newly received information. When receiving a PCRpt from another PCE, a PCE SHOULD update the LSP state only if the ORIGINAL-LSP-DB-VERSION present in the PCRpt indicates it is newer than the current ORIGINAL-LSP-DB-VERSION of the stored LSP state taking wrap around into account. This ensures that a PCE never tries to update its stored LSP state with an old information. Each time a PCE updates an LSP state in its LSP-DB, it SHOULD reset the source list associated with the LSP state and SHOULD add the source speaker address in the source list. When a PCE receives a PCRpt which has an ORIGINAL-LSP-DB-VERSION (if coming from a PCE) or an LSP-DB-VERSION (if coming from the PCC) equals to the current ORIGINAL-LSP-DB-VERSION of the stored LSP state, it SHOULD add the source speaker address in the source list.

When a PCE receives a PCRpt requesting an LSP deletion from a particular source, it SHOULD remove this particular source from the list of sources associated with this LSP.

When the list of sources becomes empty for a particular LSP, the LSP state MUST be removed. This means that all the sources must send a PCRpt with R=1 for an LSP to make the PCE remove the LSP state.

Note that a PCC uses the Open message exchange during PCEP session establishment to inform the PCE about its capabilities and parameters. Currently, there is no mechanism to pass that information to other PCEs via the state-sync session.

3.5. Computation Priority between PCEs and Sub-delegation

A computation priority is necessary to ensure that a single PCE will perform the computation for all the LSPs in an association group: this will allow for a more optimized LSP placement and will prevent computation loops.

All PCEs in the network that are handling LSPs in a common LSP association group SHOULD be aware of each other including the computation priority of each PCE. Note that there is no need for PCC to be aware of this. The computation priority is a number and the PCE having the highest priority MUST be responsible for the computation. If several PCEs have the same priority value, their IP address MUST be used as a tie-breaker to provide a rank: the highest IP address has more priority.

The computation priorities could be set through local configurations. The priority for local and remote PCEs could be set at global level so the highest priority PCE will handle all path computations or more granular, so a PCE may have the highest priority for only a subset of LSPs or association-groups. See Section 9.1 for more details. In future, PCEs could also advertise and discover these parameters via PCEP, those details are out of the scope of this document and left for future specification.

A PCEP Speaker receiving a PCRpt from a PCC with the D flag set that does not have the highest computation priority, SHOULD forward the PCRpt on all state-sync sessions (as per Section 3.3) and SHOULD set D flag on the state-sync session towards the highest priority PCE, D flag will be unset to all other state-sync sessions. This behavior is similar to the delegation behavior handled at the PCC side and is called a sub-delegation (the PCE sub-delegates the control of the LSP to another PCE). When a PCEP Speaker sub-delegates an LSP to another PCE, it loose control of the LSP and cannot update it anymore by its own decision. When a PCE receives a PCRpt with D flag set on a state-sync session, as a regular PCE, it is granted control over the LSP.

If the highest priority PCE is failing or if the state-sync session between the local PCE and the highest priority PCE failed, the local PCE MAY decide to delegate the LSP to the next highest priority PCE or to take back control of the LSP. It is a local policy decision.

When a PCE has the delegation for an LSP and needs to update this LSP, it MUST send a PCUpd message to all state-sync sessions and to the PCC session on which it received the delegation. The D-Flag would be unset in the PCUpd for state-sync sessions whereas the D-Flag would be set for the PCC. In the case of sub-delegation, the computing PCE will send the PCUpd only to all state-sync sessions (as it has no direct delegation from a PCC). The D-Flag would be set for the state-sync session to the PCE that sub-delegated this LSP and the D-Flag would be unset for other state-sync sessions.

The PCUpd sent over a state-sync session MUST contain the SPEAKER-ENTITY-ID TLV in the LSP Object (the value used must identify the target PCC). The PLSP-ID used is the original PLSP-ID generated by the PCC and learned from the forwarded PCRpt. If a PCE receives a PCUpd on a state-sync session without the SPEAKER-ENTITY-ID TLV, it MUST discard the PCUpd and MUST reply with a PCErr message using error-type=6 (Mandatory Object missing) and error-value=TBD1 (SPEAKER-ENTITY-ID TLV missing).

When a PCE receives a valid PCUpd on a state-sync session, it SHOULD forward the PCUpd to the appropriate PCC (identified based on the SPEAKER-ENTITY-ID TLV value) that delegated the LSP originally and SHOULD remove the SPEAKER-ENTITY-ID TLV from the LSP Object. The acknowledgment of the PCUpd is done through a cascaded mechanism, and the PCC is the only responsible for triggering the acknowledgment: when the PCC receives the PCUpd from the local PCE, it acknowledges it with a PCRpt as per [RFC8231]. When receiving the new PCRpt from the PCC, the local PCE uses the defined forwarding rules on the state-sync session so the acknowledgment is relayed to the computing PCE.

3.5.1. Association Group

All LSPs belonging to the same association group SHOULD have the same computation priorities for the PCEs. A PCE SHOULD NOT compute a path using an association-group constraint if it has delegation for only a subset of LSPs in the association-group. In this case, an implementation MAY use a local policy on PCE to decide if PCE does not compute path at all for this set of LSP or if it can compute a path by relaxing the association-group constraint.

3.6. Passive Stateful Procedures

In the passive stateful PCE architecture, the PCC is responsible for triggering a path computation request using a PCReq message to its PCE. Similarly to PCRpt Message, which remains unchanged for passive mode, if a PCE receives a PCReq for an LSP and if this PCE finds that it does not have the highest computation priority of this LSP, or groups, it MUST forward the PCReq message to the highest priority PCE over the state-sync session. When the highest priority PCE receives the PCReq, it computes the path and generates a PCRep message towards the PCE that made the request. This PCE will then forward the PCRep to the requesting PCC. The handling of LSP object and the SPEAKER-ENTITY-ID TLV in PCReq and PCRep is similar to PCRpt/PCUpd messages.

3.7. PCE Initiation Procedures

It is possible that a PCE does not have a PCEP session with the headend to initiate a LSP as per [RFC8281]. A PCE could send the PCInitiate message on the state-sync sessions to other PCE to request it to create a PCE-Initiated LSP on its behalf. If the PCE is able to initiate the LSP it would report it on the state-sync session via PCRpt message. If the PCE does not have a session to the headend, it MUST send a PCErr message with Error-type=24 (PCE instantiation error) and Error-value=TBD5 (No PCEP session with the headend). PCE could try to initiate via another state-sync PCE if available.

4. Examples

The examples in this section are for illustrative purpose only, to show how the behavior of the state sync inter-PCE session works.

4.1. Example 1 - Successful disjoint paths (requiring reroute)

      _________________________________________
     /                                         \
    /        +------+            +------+       \
   |         | PCE1 |            | PCE2 |        |
   |         +------+            +------+        |
   |                                             |
   | +------+           10             +------+  |
   | | PCC1 | ----- R1 ---- R2 ------- | PCC2 |  |
   | +------+       |        |         +------+  |
   |                |        |                   |
   |                |        |                   |
   | +------+       |        |         +------+  |
   | | PCC3 | ----- R3 ---- R4 ------- | PCC4 |  |
   | +------+                          +------+  |
   |                                             |
    \                                           /
     \_________________________________________/


          +----------+
          |   PCC1   |  LSP : PCC1->PCC2
          +----------+
            /
       D=1 /
   +---------+    +---------+
   |  PCE1   |----|  PCE2   |
   +---------+    +---------+
                   / D=1
                  /
          +----------+
          |   PCC3   |  LSP : PCC3->PCC4
          +----------+

PCE1 computation priority 100
PCE2 computation priority 200

Consider the PCEP sessions as shown above, where computation priority is global for all the LSPs and a link disjoint path between LSPs PCC1->PCC2 and PCC3->PCC4 is required.

Consider the PCC1->PCC2 is configured first and PCC1 delegates the LSP to PCE1, but as PCE1 does not have the highest computation priority, it sub-delegates the LSP to PCE2 by sending a PCRpt with D=1 and including the SPEAKER-ENTITY-ID TLV over the state-sync session. PCE2 receives the PCRpt and as it has delegation for this LSP, it computes the shortest path: R1->R3->R4->R2->PCC2. It then sends a PCUpd to PCE1 (including the SPEAKER-ENTITY-ID TLV) with the computed ERO. PCE1 forwards the PCUpd to PCC1 (removing the SPEAKER-ENTITY-ID TLV). PCC1 acknowledges the PCUpd by a PCRpt to PCE1. PCE1 forwards the PCRpt to PCE2.

When PCC3->PCC4 is configured, PCC3 delegates the LSP to PCE2, PCE2 can compute a disjoint path as it has knowledge of both LSPs and has delegation also for both. The only solution found is to move PCC1->PCC2 LSP on another path, PCE2 can move PCC1->PCC2 as it has sub-delegation for it. It creates a new PCUpd with a new ERO: R1->R2-PCC2 towards PCE1 which forwards to PCC1. PCE2 sends a PCUpd to PCC3 with the path: R3->R4->PCC4.

In this set-up, PCEs are able to find a disjoint path while without state-sync and computation priority they could not.

4.2. Example 2 - Successful disjoint paths (simultaneous turnup)

      _____________________________________
     /                                     \
    /        +------+        +------+       \
   |         | PCE1 |        | PCE2 |        |
   |         +------+        +------+        |
   |                                         |
   | +------+         100          +------+  |
   | |      | -------------------- |      |  |
   | | PCC1 | ----- R1 ----------- | PCC2 |  |
   | +------+       |              +------+  |
   |    |           |                  |     |
   |  6 |           | 2                | 2   |
   |    |           |                  |     |
   | +------+       |              +------+  |
   | | PCC3 | ----- R3 ----------- | PCC4 |  |
   | +------+               10     +------+  |
   |                                         |
    \                                       /
     \_____________________________________/


          +----------+
          |   PCC1   |  LSP : PCC1->PCC2
          +----------+
            /     \
       D=1 /       \ D=0
   +---------+    +---------+
   |  PCE1   |----|  PCE2   |
   +---------+    +---------+
        D=0 \      / D=1
             \    /
          +----------+
          |   PCC3   |  LSP : PCC3->PCC4
          +----------+

PCE1 computation priority 200
PCE2 computation priority 100

In this example, suppose both LSPs are configured almost at the same time. PCE1 sub-delegates PCC1->PCC2 to PCE2 while PCE2 keeps delegation for PCC3->PCC4, PCE2 computes a path for PCC1->PCC2 and PCC3->PCC4 and can achieve disjointness computation easily. No computation loop happens in this case.

4.3. Example 3 - Unfeasible disjoint paths (insufficient state-sync sessions)

      _________________________________________
     /                                         \
    /        +------+            +------+       \
   |         | PCE1 |            | PCE2 |        |
   |         +------+            +------+        |
   |                                             |
   | +------+           10             +------+  |
   | | PCC1 | ----- R1 ---- R2 ------- | PCC2 |  |
   | +------+       |        |         +------+  |
   |                |        |                   |
   |                |        |                   |
   | +------+       |        |         +------+  |
   | | PCC3 | ----- R3 ---- R4 ------- | PCC4 |  |
   | +------+                          +------+  |
   |                                             |
    \                                           /
     \_________________________________________/


          +----------+
          |   PCC1   |  LSP : PCC1->PCC2
          +----------+
            /
       D=1 /
   +---------+    +---------+    +---------+
   |  PCE1   |----|  PCE2   |----|  PCE3   |
   +---------+    +---------+    +---------+
                   / D=1
                  /
          +----------+
          |   PCC3   |  LSP : PCC3->PCC4
          +----------+

PCE1 computation priority 100
PCE2 computation priority 200
PCE3 computation priority 300

With the PCEP sessions as shown above, consider the need to have link disjoint LSPs PCC1->PCC2 and PCC3->PCC4.

Suppose PCC1->PCC2 is configured first, PCC1 delegates the LSP to PCE1, but as PCE1 does not have the highest computation priority, it will sub-delegate the LSP to PCE2 (as it not aware of PCE3 and has no way to reach it). PCE2 cannot compute a path for PCC1->PCC2 as it does not have the highest priority and is not allowed to sub-delegate the LSP again towards PCE3 as per Section 3.

When PCC3->PCC4 is configured, PCC3 delegates the LSP to PCE2 that performs sub-delegation to PCE3. As PCE3 will have knowledge of only one LSP in the group, it cannot compute disjointness and can decide to fall-back to a less constrained computation to provide a path for PCC3->PCC4. In this case, it will send a PCUpd to PCE2 that will be forwarded to PCC3.

Disjointness cannot be achieved in this scenario because of lack of state-sync session between PCE1 and PCE3, but no computation loop happens. Thus it is required for all PCEs that support state-sync to have a full mesh sessions between each other.

5. Using Primary/Secondary Computation and State-sync Sessions to increase Scaling

The Primary/Secondary computation and state-sync sessions architecture can be used to increase the scaling of the PCE architecture. If the number of PCCs is really high, it may be too resource consuming for a single PCE instance to maintain all the PCEP sessions while at the same time performing all path computations. Using primary/secondary computation and state-sync sessions may allow to create groups of PCEs that manage a subset of the PCCs and perform some or no path computations. Decoupling PCEP session maintenance and computation will allow increasing scaling of the PCE architecture.


            +----------+
            |  PCC500  |
          +----------+-+
          |   PCC1   |
          +----------+
            /     \
           /       \
   +---------+   +---------+
   |  PCE1   |---|  PCE2   |
   +---------+   +---------+
        |    \  /    |
        |     \/     |
        |     /\     |
        |    /  \    |
   +---------+   +---------+
   |  PCE3   |---|  PCE4   |
   +---------+   +---------+
           \       /
            \     /
          +----------+
          |  PCC501  |
          +----------+-+
            |  PCC1000 |
            +----------+

In the figure above, two groups of PCEs are created: PCE1/2 maintain PCEP sessions with PCC1 up to PCC500, while PCE3/4 maintain PCEP sessions with PCC501 up to PCC1000. A granular primary/secondary policy is set-up as follows to load-share computation between PCEs:

If some PCCs delegate LSPs with association ID 1 up to 300 and association source 0.0.0.0, the receiving PCE (if not PCE1) will sub-delegate the LSPs to PCE1. PCE1 becomes responsible for the computation of these LSP associations while PCE3 is responsible for the computation of another set of associations.

The procedures described in this document could help greatly in load-sharing between a group of stateful PCEs.

6. PCEP-PATH-VECTOR TLV

This specification allows PCEP messages to be propagated among PCEP speaker. It may be useful to track information about the propagation of the messages. One of the use cases is a message loop detection mechanism, but other use cases like hop by hop information recording may also be implemented in future.

This document introduces the PCEP-PATH-VECTOR TLV (type TBD3) to be encoded in the LSP Object with the following format:

 0                   1                   2                   3
 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|               Type=TBD3       |            Length             |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|              PCEP-SPEAKER-INFORMATION#1                       |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|              ...                                              |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|              ...                                              |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|              PCEP-SPEAKER-INFORMATION#n                       |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+

The TLV format and padding rules are as per [RFC5440].

The PCEP-SPEAKER-INFORMATION field has the following format:

 0                   1                   2                   3
 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
|     Length                    |      ID Length                |
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
//              Speaker Entity identity (variable)             //
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+
//              Sub-TLVs (optional)                            //
+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+

The PCEP-PATH-VECTOR TLV MAY be carried in the LSP Object. Its usage is purely optional.

If a PCEP speaker receives a message with PCEP-PATH-VECTOR TLV and finds its speaker information already present in the PCEP-PATH-VECTOR TLV, it MUST ignore the PCEP message and SHOULD log it as an error.

The list of speakers within the PCEP-PATH-VECTOR TLV MUST be ordered. When sending a PCEP message (PCRpt, PCUpd, or PCInitiate), a PCEP Speaker MAY add the PCEP-PATH-VECTOR TLV with a PCEP-SPEAKER-INFORMATION containing its own information. If the PCEP message sent is the result of a previously received PCEP message, and if the PCEP-PATH-VECTOR TLV was already present in the initial message, the PCEP speaker MAY append a new PCEP-SPEAKER-INFORMATION containing its own information.

7. Security Considerations

The security considerations described in [RFC8231] and [RFC5440] apply to the extensions described in this document as well. Additional considerations related to state synchronization and sub-delegation between stateful PCEs are introduced, as it could be spoofed and could be used as an attack vector. An attacker could attempt to create too much state in an attempt to load the PCEP peer. The PCEP peer could respond with a PCErr message as described in [RFC8231]. An attacker could impact LSP operations by creating bogus state. Further, state synchronization between stateful PCEs could provide an adversary with the opportunity to eavesdrop on the network. Thus, securing the PCEP session using Transport Layer Security (TLS) [RFC8253], as per the recommendations and best current practices in [RFC9325], is RECOMMENDED.

8. Implementation Status

[Note to the RFC Editor - remove this section before publication, as well as remove the reference to RFC 7942.]

This section records the status of known implementations of the protocol defined by this specification at the time of posting of this Internet-Draft, and is based on a proposal described in [RFC7942]. The description of implementations in this section is intended to assist the IETF in its decision processes in progressing drafts to RFCs. Please note that the listing of any individual implementation here does not imply endorsement by the IETF. Furthermore, no effort has been spent to verify the information presented here that was supplied by IETF contributors. This is not intended as, and must not be construed to be, a catalog of available implementations or their features. Readers are advised to note that other implementations may exist.

According to [RFC7942], "this will allow reviewers and working groups to assign due consideration to documents that have the benefit of running code, which may serve as evidence of valuable experimentation and feedback that have made the implemented protocols more mature. It is up to the individual working groups to use this information as they see fit".

At the time of posting the -06 version of this document, there are no known implementations of this mechanism. It is believed that some vendors are considering implementations, but these plans are too vague to make any further assertions.

9. Manageability Considerations

9.1. Control of Function and Policy

An operator MUST be allowed to configure the capability to support state-sync procedures for a inter-PCE session. They MUST allow configuration of a computation priority of the local and remote PCEs at the global level. They MAY also allow configuration of computation priority of the local and remote PCEs per association (or a range of them). Further, they MAY also allow configuration of computation priority per PCC (or range of them). An implementation MAY support other such configuration levels for computation priority of the local and remote PCEs.

9.2. Information and Data Models

An implementation SHOULD allow the operator to view the capability defined in this document. To serve this purpose, the PCEP YANG module [I-D.ietf-pce-pcep-yang] could be extended in the future.

9.3. Liveness Detection and Monitoring

Mechanisms defined in this document do not imply any new liveness detection and monitoring requirements in addition to those already listed in [RFC5440].

9.4. Verify Correct Operations

Mechanisms defined in this document do not imply any new operation verification requirements in addition to those already listed in [RFC5440].

9.5. Requirements On Other Protocols

Mechanisms defined in this document do not imply any new requirements on other protocols.

9.6. Impact On Network Operations

Mechanisms defined in this document improves the network operations by alleviating the problems described in Section 1.

10. Acknowledgements

Thanks to [I-D.knodel-terminology] urging for better use of terms.

11. IANA Considerations

This document requests IANA actions to allocate code points for the protocol elements defined in this document.

11.1. PCEP-Error Object

IANA is requested to allocate a new Error Value for the Error Type 6 and 24.

Table 1
Error-Type Meaning Reference
6 Mandatory Object Missing [RFC5440]
Error-value=TBD1: SPEAKER-ENTITY-ID TLV missing This document
24 LSP instantiation error [RFC8281]
Error-value=TBD5: No PCEP session with the headend This document

11.2. PCEP TLV Type Indicators

IANA is requested to allocate new TLV Type Indicator values within the "PCEP TLV Type Indicators" sub-registry of the PCEP Numbers registry, as follows:

Table 2
Value Meaning Reference
TBD2 ORIGINAL-LSP-DB-VERSION TLV This document
TBD3 PCEP-PATH-VECTOR TLV This document

11.3. STATEFUL-PCE-CAPABILITY TLV

IANA is requested to allocate a new bit value in the STATEFUL-PCE-CAPABILITY TLV Flag Field sub-registry.

Table 3
Bit Description Reference
TBD4 INTER-PCE-CAPABILITY This document

12. References

12.1. Normative References

[RFC2119]
Bradner, S., "Key words for use in RFCs to Indicate Requirement Levels", BCP 14, RFC 2119, DOI 10.17487/RFC2119, , <https://www.rfc-editor.org/info/rfc2119>.
[RFC5440]
Vasseur, JP., Ed. and JL. Le Roux, Ed., "Path Computation Element (PCE) Communication Protocol (PCEP)", RFC 5440, DOI 10.17487/RFC5440, , <https://www.rfc-editor.org/info/rfc5440>.
[RFC8174]
Leiba, B., "Ambiguity of Uppercase vs Lowercase in RFC 2119 Key Words", BCP 14, RFC 8174, DOI 10.17487/RFC8174, , <https://www.rfc-editor.org/info/rfc8174>.
[RFC8231]
Crabbe, E., Minei, I., Medved, J., and R. Varga, "Path Computation Element Communication Protocol (PCEP) Extensions for Stateful PCE", RFC 8231, DOI 10.17487/RFC8231, , <https://www.rfc-editor.org/info/rfc8231>.
[RFC8232]
Crabbe, E., Minei, I., Medved, J., Varga, R., Zhang, X., and D. Dhody, "Optimizations of Label Switched Path State Synchronization Procedures for a Stateful PCE", RFC 8232, DOI 10.17487/RFC8232, , <https://www.rfc-editor.org/info/rfc8232>.
[RFC8253]
Lopez, D., Gonzalez de Dios, O., Wu, Q., and D. Dhody, "PCEPS: Usage of TLS to Provide a Secure Transport for the Path Computation Element Communication Protocol (PCEP)", RFC 8253, DOI 10.17487/RFC8253, , <https://www.rfc-editor.org/info/rfc8253>.

12.2. Informative References

[I-D.ietf-pce-pcep-yang]
Dhody, D., Beeram, V. P., Hardwick, J., and J. Tantsura, "A YANG Data Model for Path Computation Element Communications Protocol (PCEP)", Work in Progress, Internet-Draft, draft-ietf-pce-pcep-yang-22, , <https://datatracker.ietf.org/doc/html/draft-ietf-pce-pcep-yang-22>.
[I-D.knodel-terminology]
Knodel, M. and N. ten Oever, "Terminology, Power, and Inclusive Language in Internet-Drafts and RFCs", Work in Progress, Internet-Draft, draft-knodel-terminology-14, , <https://datatracker.ietf.org/doc/html/draft-knodel-terminology-14>.
[RFC4655]
Farrel, A., Vasseur, J.-P., and J. Ash, "A Path Computation Element (PCE)-Based Architecture", RFC 4655, DOI 10.17487/RFC4655, , <https://www.rfc-editor.org/info/rfc4655>.
[RFC6805]
King, D., Ed. and A. Farrel, Ed., "The Application of the Path Computation Element Architecture to the Determination of a Sequence of Domains in MPLS and GMPLS", RFC 6805, DOI 10.17487/RFC6805, , <https://www.rfc-editor.org/info/rfc6805>.
[RFC7399]
Farrel, A. and D. King, "Unanswered Questions in the Path Computation Element Architecture", RFC 7399, DOI 10.17487/RFC7399, , <https://www.rfc-editor.org/info/rfc7399>.
[RFC7942]
Sheffer, Y. and A. Farrel, "Improving Awareness of Running Code: The Implementation Status Section", BCP 205, RFC 7942, DOI 10.17487/RFC7942, , <https://www.rfc-editor.org/info/rfc7942>.
[RFC8051]
Zhang, X., Ed. and I. Minei, Ed., "Applicability of a Stateful Path Computation Element (PCE)", RFC 8051, DOI 10.17487/RFC8051, , <https://www.rfc-editor.org/info/rfc8051>.
[RFC8281]
Crabbe, E., Minei, I., Sivabalan, S., and R. Varga, "Path Computation Element Communication Protocol (PCEP) Extensions for PCE-Initiated LSP Setup in a Stateful PCE Model", RFC 8281, DOI 10.17487/RFC8281, , <https://www.rfc-editor.org/info/rfc8281>.
[RFC8751]
Dhody, D., Lee, Y., Ceccarelli, D., Shin, J., and D. King, "Hierarchical Stateful Path Computation Element (PCE)", RFC 8751, DOI 10.17487/RFC8751, , <https://www.rfc-editor.org/info/rfc8751>.
[RFC8800]
Litkowski, S., Sivabalan, S., Barth, C., and M. Negi, "Path Computation Element Communication Protocol (PCEP) Extension for Label Switched Path (LSP) Diversity Constraint Signaling", RFC 8800, DOI 10.17487/RFC8800, , <https://www.rfc-editor.org/info/rfc8800>.
[RFC9059]
Gandhi, R., Ed., Barth, C., and B. Wen, "Path Computation Element Communication Protocol (PCEP) Extensions for Associated Bidirectional Label Switched Paths (LSPs)", RFC 9059, DOI 10.17487/RFC9059, , <https://www.rfc-editor.org/info/rfc9059>.
[RFC9325]
Sheffer, Y., Saint-Andre, P., and T. Fossati, "Recommendations for Secure Use of Transport Layer Security (TLS) and Datagram Transport Layer Security (DTLS)", BCP 195, RFC 9325, DOI 10.17487/RFC9325, , <https://www.rfc-editor.org/info/rfc9325>.
[RFC9552]
Talaulikar, K., Ed., "Distribution of Link-State and Traffic Engineering Information Using BGP", RFC 9552, DOI 10.17487/RFC9552, , <https://www.rfc-editor.org/info/rfc9552>.

Appendix A. Contributors

Dhruv Dhody
Huawei
India

Email: dhruv.ietf@gmail.com

Authors' Addresses

Stephane Litkowski
Cisco
Siva Sivabalan
Ciena Corporation
Cheng Li
Huawei Technologies
Huawei Campus, No. 156 Beiqing Rd.
Beijing
100095
China
Haomian Zheng
Huawei Technologies
H1, Huawei Xiliu Beipo Village, Songshan Lake
Dongguan
Guangdong, 523808
China